Homepage / Contents in : Technical Commission II

Media in this channel :

Categories in this channel

Content with tag3d modelling In the channelTechnical Commission II (2)

From archive documentation to online 3D model visualization of no longer existing structur...

Technical Commission II

1374
From archive documentation to online 3D model visualization of no longer existing structures: the Turin 1911 project
Alessandra SPREAFICO

Baroque banded vaults: surveying and modeling. The case study of a noble palace in Turin

Technical Commission II

1351
Baroque banded vaults: surveying and modeling. The case study of a noble palace in Turin
Roberta SPALLONE